Liverpool Quarter
Location
Ashfield, NSW
Construction Value
AUD $1.6M
Project Size
500 m² (109 units)
Services provided
• Professional advise on material selection
• Documentation
• Reviewing fire orders
• Analyse the conditions of approval
• Liaison with stakeholders
• Providing design certificate and statement
The project is an 11-story mixed-use complex constructed with reinforced concrete columns and slabs. The building featured aluminum composite panel (ACP) cladding around the ground floor, as well as some curved ACP at the rooftop area, which all needed to be replaced.
The curvy parapet trim has a radius of less than 200mm, making it difficult to find approved material. Addressing the curved ACP panels required the careful selection of materials and precise measurements to match the building's curvature. Our remediated facade solution considered and balanced various factors, including cost-effectiveness, feasibility, and safety considerations